Product

How EZRS Supports the Four Levels of Reserve Study

One gate illustrates four scopes of reserve work. EZRS® Web and EZRS® Inspect connect its records to professional funding analysis.

How EZRS Supports the Four Levels of Reserve Study 

Planning for an entrance gate’s future replacement can begin before the community is built. As years pass, design estimates give way to site observations and completed-project records. Association managers need each change reflected in the figures behind budget discussions. 

Easy Reserve Study® (EZRS®) connects that information through two features within its reserve management and capital planning platform. EZRS® Web is the browser-based workspace for property records and funding projections. EZRS® Inspect is the mobile app for recording site observations and photos. Reserve professionals use those field records in Web to evaluate replacement needs and recommend funding. 

The gate’s lifecycle illustrates how EZRS supports the four service levels in the Community Associations Institute’s Reserve Study Standards. The platform’s funding methods align with the National Reserve Study Standards. The Standards number the levels by type rather than timing, so this post follows the gate from design to replacement: Level IV first, then Levels I, II and III. 

 

Before Construction: Level IV Preliminary Study 

Before the community is built, a preliminary study uses design documents to estimate future reserve needs. The professional enters the proposed gate’s estimated cost and useful life in Web. 

Web uses those inputs in funding projections for the initial reserve budget, helping managers discuss future replacement costs before installation. 

 

Once Built: Level I Full Study 

Once the community is built, a full study combines an on-site assessment with funding analysis. Inspect lets the professional document the installed gate’s condition and capture photos during the visit. 

Those observations inform the estimates entered in Web, where replacement costs and remaining life feed into the community’s funding projections. 

 

As It Ages: Level II Update With a Site Visit 

As the gate ages, another site visit checks whether earlier estimates still fit its condition. The professional records fresh observations through Inspect, then revises the gate’s estimates in Web. 

If replacement is needed sooner, Web’s projections show the earlier expense. The professional can assess funding adjustments, giving the manager reviewed figures for budget discussions. 

 

Between Visits: Level III Update Without a Site Visit 

Between visits, Web remains the workspace for updates based on supplied information. After the gate is replaced, the manager provides the invoice and installation date for professional review. 

Revised estimates establish the next replacement cycle, while an updated reserve balance accounts for the money spent. Web’s projections then reflect the new gate and remaining funds. 

 

Keep the Plan Current Between Studies 

Inspect supports the professional’s fieldwork, while Web connects observations and subsequent updates to funding projections. Together, they help managers maintain useful information throughout the gate’s replacement cycle. 

Explore EZRS® for property management companies. 

  

About Easy Reserve Study (EZRS®) 

EZRS® makes reserve management and capital planning easy—from collecting and managing data to building plans and keeping them current between studies. Built for property management companies, resort management companies, reserve professionals, and the boards they serve, EZRS® brings reserve data, funding scenarios, budgets, and board-ready reports into one platform.